The open field that will become Graceway Community Church’s new home looks nothing like it did a few weeks ago. Since our groundbreaking celebration with the congregation, A.O. Wagner Construction crews have stripped the grass, graded the site, and begun preparing the site for the new 16,000-square-foot pre-engineered metal building.
Meet Our Site Work Partner
Every quality build starts with a well-prepared site, and for this project we’ve teamed up with Roggen Clyne Development, Inc. Established in 1986, Roggen Clyne is a leader in civil and utility construction throughout Central Florida, providing structural and site preparation services across the state. Their sign now stands right alongside ours at the entrance to the property.

Their roller and loader have been hard at work on site, handling the heavy lifting that sets up everything to come.

Clearing and Grading the Site
The first order of business was scraping away the existing grass and grading the full site. That work covers the future parking lot, the landscaped island, and the building pad itself.

The building pad is now being graded flat and level, creating a solid base for the new Whirlwind Steel PEMB. Getting the pad right at this stage is what keeps the slab and structure sound for decades to come.


Sod Goes Down
Fresh sod is already rolling out along the edges of the site. A loader moves pallets of sod into position while crews lay each piece by hand, helping stabilize the soil and control erosion as work continues across the property.


What’s Next?
Grading is only the first piece of this complete site package. Still ahead are the storm sewer system, a new lift station, limerock for stabilization, asphalt paving, curbs, striping and signage, a wet tap to the water main, a fire hydrant, sidewalks, and concrete aprons.
Once the pad is ready, it will support a 16,000-square-foot pre-engineered metal building from Whirlwind Steel Buildings, which has been fabricating award-winning custom metal buildings and components since 1955. A drive-thru canopy at the front of the building will welcome visitors when the church opens its doors in fall 2027.
Planning Your Next Build?
Whether it is a multi-phase commercial build or a smaller project, the A.O. Wagner Construction team brings the same standard of quality to every job. Reach out today to talk about what we can take off your plate.
A.O. Wagner Construction provides full-service general contracting, management services, and design/build construction throughout Central Florida. We love serving Winter Haven, Lakeland, Davenport, Haines City, Auburndale, Avon Park, and neighboring areas! Follow our Project Build Blog to see more of our past projects. For more information, please email us at info@aowagnerfl.com or call 863-299-4444.
