Edward Jones Interior Build-Out Begins in Lake Wales

Our A.O. Wagner Construction team officially began an interior build-out for an Edward Jones Financial Advisor office in Lake Wales in mid-February. The 4,000-square-foot project involves transforming the existing spaces to meet current standards and is set for completion by the end of April.

At the heart of this renovation is a blend of selective demolition and precision construction to create a highly functional and aesthetically refined office. The project scope includes new office framing, acoustical ceiling installations, fresh flooring, reconfigured casework, electrical upgrades, and relocating existing HVAC and plumbing features. 

The new space will have a refined look and be fully ADA compliant. It’s a long-awaited office area upgrade built to the highest standards.

Demolition Process & Structural Preparations

The first step to ADA compliance was our demolition process and efforts that required carefully removing 70-year-old tile in the existing bathrooms. The aged tile was carefully stripped away to prepare for new wall and floor installations. Simultaneously, sections of the existing casework and countertops were removed, allowing space for new walls and updated functional layouts.


Fir strips were added along existing walls to prepare for drywall installations. These strips provide an even surface for drywall application and ensure improved insulation and durability. An existing doorway was also closed off, marking the first steps toward optimizing space utilization.


Framing For Future Office Spaces

As part of the office reconfiguration and the creation of designated office spaces, new framing was installed to divide open areas. These interior walls will create a structured, professional environment while incorporating acoustic considerations for soundproofing. Integrating sustainable materials ensures durability while maintaining a sleek, contemporary design.

With demolition and framing well underway, the next phase will introduce electrical and mechanical upgrades before progressing into finishes. A.O. Wagner Construction remains committed to delivering a high-quality build-out that aligns with Edward Jones’ standards for functionality and design. Stay tuned for more updates as the interior build-out transformation continues.

Does Your Office Need an Interior Build-Out?

A.O. Wagner Construction provides full-service general contracting, management services, and design/build construction throughout Central Florida. We love serving Winter Haven, Lakeland, Davenport, Haines City, Auburndale, Avon Park, and neighboring areas! Follow our Project Build Blog to see more of our past projects. For more information, please email us at info@aowagnerfl.com or call 863-299-4444